Just a couple tid-bits:
2 million pounds of our material (made right here in southern utah!) helped provide 75% of the thrust needed to get the 5.75 million pound Artemis rocket into orbit.
SLS
Height: 322 feet
Mass at liftoff: 5.75 million pounds
Thrust at liftoff: 8.8 million pounds
Payload to the Moon: 59,000 pounds
launch stuff (not official, just based off the commentary from the launch, and other NASA info):
0 --> 80mph: 7 seconds
1 minute after liftoff: ~1400 mph
1 minute 20 seconds after liftoff: ~2800 mph
2 minute 20 seconds after liftoff: ~3400 mph
3 minutes after liftoff: ~4000 mph
Entered orbit ~8 minutes after launch and ~17,500 mph.
87 minutes after launch, ICPS engine burn increased speed from 17,500 to 22,500 mph.
the return trip atmosphere re-entry speed will be ~25,000 mph!
Mission duration: 25 days
Total estimated travel distance: 1.3 million miles